2014年1月8日星期三

Electric eot crane hoist installation methods described in detail

First, you need to install the sino hoist box ; Second , connect the power cord to connect the power cord to be cut off in advance. While the ground should be well grounded , otherwise touch any part of the operator or chain hoist , may feel a shock feeling. Third, the degree of load chain lubrication chain lubrication chain hoist load chain is an important factor affecting the service life . Timely and effective lubrication of the effective life of the load chain , in order to ensure the chain. Fourth, check the chain hoist gantry crane for multiple lines of electric chain hoist chain should ensure that aircraft are not under the hook flipped . If you flip to restore it to a normal state, to ensure that the chain of weld arranged in rows . Do not twist the chain hoist hanging loads. Finally, check the operating voltage due to electric chain hoist factory , is based on user-specified voltage or high voltage equipment ( only dual voltage terms ) , such as 230/460V, need to check the wiring and make sure the power supply voltage meets requirements. If not, please refer to the manual must be corrected in order to meet the requirements of the operating voltage .

没有评论:

发表评论