2014年4月15日星期二

hoist crane maintenance and repair

1, lubrication
The lifting mechanism and the Hoist crane performance largely depends on the life of lubrication. See their manual lubrication, maintenance, lubrication, mechanical and electrical products, go carts, chain hoists truss vehicles grease injection once a week. Rope off the case should pay attention to. If broken wires, broken or worn scrap volume, should be replaced with new ropes. Expander
Spreader must be checked regularly.
2, pulley block
Wear the main rope groove, with or without rims crack in the shaft and the pulley has no clogging. Periodically checking the bridge crane wheel wear and tear or crack up to 10% of the thickness of the peripheral edge portion of the tread and the wheel flange should be replaced with a new wheel.
3, the brake
Each class should be checked once. Braking action to be accurate, this Electric hoist crane pin must not be stuck phenomenon. Shoe should be the correct fit of the brake wheel, brake shoe clearance should be equal.

2014年4月12日星期六

hoist crane inspection and maintenance Weekly

 Maintenance and inspection once a week, inspection and maintenance of the following:
1) Check the hoist crane brakes on the nut, cotter pins, positioning plates are complete, loose, leverage and spring no cracks, pin bolt on the brake wheel and cushion washer is loose, complete; brakes are reliable braking. The opening of the brake pad to open the brake should be less than 1.0mm and with both sides of the brake wheel clearance distance should be equal, each axle pin may not have stuck.
2) Check the safety switch and limit switches are accurate, flexible and reliable work, especially rising limit is reliable.
3) Check the wire rope wound on reels and pulleys are normal, with or without removal slot, string tank, knotted, twisted and other phenomena, rope plate bolts are tightened, whether a double nut locking device.
4) Check the Hoist gantry crane fastening screw lifting mechanism on the loose coupling closures, shortages.
Drive 5) Check the body is normal, with or without abnormal noise.
6) Check all lubrication lubrication condition is good.
Are there foreign body obstruction machines running on the bridge 7) Check the track.

2014年3月25日星期二

overhead crane engine optimization design

  Engineering and mechanical power transmission system optimization is an important way to reduce fuel consumption by optimizing the design , load sensing control , the effective power and power distribution reasonable use of the engine , the engine power output is always in the best condition , and to XinXiang Crane overhead crane engine safe protection status under harsh working conditions .
  This technology has now become an international competition highlights engineering machinery , as well as China's construction machinery industry in the " Twelfth Five-Year " period for energy conservation, improve the added value of an important development direction of product technology , especially large wide range of mainstream products, market demand, the fuel guzzler , should serve as a bridge crane industry change the growth mode of the key tasks of a good job , to carry it out .
  Most of the domestic construction XinXiang Crane overhead gantry crane mastered the core technology in a number of supporting foreign enterprises from key components to the system , most of them are imported from abroad. The main reason is foreign to the relevant components and technology research has for decades or even centuries of accumulation, while domestic enterprises are mostly from the overhead crane in the 1990s or even late begun to work in this area , the gap not a short period of time can be eliminated.
   So , seize the development opportunity of dynamic mechanical bridge crane , has great significance for narrowing the gap with foreign engineering machinery products and improve their competitiveness .

2014年1月23日星期四

Grab hook type gantry crane operation safety hazards

"One machine can" in order to improve the efficiency of loading and unloading operations, streamline operations, reduce personnel manual labor, improve security operations security, but also improve the existing gantry crane is an important means of utilization. sino hoist Therefore, different varieties of packaged goods Soca tools, such as grab, timber grab, container spreader, steel hooks, coil clips, etc., hanging on the door to get the promotion and application success. Any use of Soca with, the necessary conditions to ensure personal, equipment, cargo security. But the recent detection of a gantry crane found in the station, the station a 20/10 t C-type door grab crane during operation, there is a more serious overload of work, but whether it is management, or the use of staff has neither aware of the existence of overweight. According to the survey, hoist gantry crane the railway yard gantry crane using four rope grab operation, almost all such problems exist. When equipped with grab, no matter whether the change in varieties of goods, grab generally unchanged.

2014年1月22日星期三

Gantry crane

Is an important branch of general sino hoist machinery , as stevedores to reduce labor intensity and improve the conditions of workers to operate and improve the production capacity of loading and unloading of large lifting and handling equipment , widely used in the open-air yard , storage terminals , railway stations , construction sites and other places. With economic development , it is not only occupies an important position in the national economy , but also in the field of social production and life are also expanding. Main beam is the main force component gantry crane under load , will produce under torsion deformation, trolley tracks a certain slope, so the car climbing resistance generated by the main hoist gantry crane beams running across the middle to the ends , it may cause motor overload or gnawing different degrees rail , seriously affecting the crane to work, and even lead to accidents. Currently, the way to solve such problems in the industry are designed and manufactured the crane when the main beam geometry on a certain arch . In fact , this is also not reasonable arch curve , the same slope to overcome considerable resistance because when the car is running near the legs , and, after working for some time on the camber deformation will gradually reduce , or even disappear. This paper attempts to take advantage of changes in the height of the main beam deflection legs to compensate for deformation under the influence , combined with the finite element analysis software ANSYS simulation , and achieved the expected results.

2014年1月20日星期一

Truss gantry crane

With light weight , small frontal area , large carrying capacity and other characteristics, are widely used in factories , railway stations , ports, power plants, construction sites and other steel crane areas of production. Rationality and reliability of its security architecture design , and the ability to work directly determines the efficiency of the crane . Now most companies by virtue of experience to design truss gantry crane , the utilization of steel is low, and detailed design calculations and relatively cumbersome. Therefore, the steel truss crane design and analysis , has become the focus of design in the field of research , and the main beam is a major part of the door frame . In this paper, the use of modern design methods, lifting the total mass of 60 t, span 40 m, lifting height of 16 m, main beam structure hoist gantry crane working-level A3 truss gantry crane optimization. Main beam structure optimization mathematical model of optimization objective function optimization goals gantry crane metal structure is the total mass of the smallest structure itself , which is a parameter VOLUME minimum value . Design variables need to optimize the design variables are independent variables objective function and state function . Optimization process is optimized by constantly changing variable values ​​to achieve. Truss girder gantry crane main components, mainly steel, link8 unit can be modeled .

2014年1月17日星期五

Vertical and horizontal gantry crane dynamic stiffness

Vertical and horizontal gantry crane dynamic stiffness Ge-Ning Xu . Tsui Hark Jin ( Department of Mechanical Engineering ) Abstract gantry cranes for different types of vibration analysis conducted research , presented a series of practical formulas gantry crane vertical and horizontal dynamic stiffness , add a calculation method static and hoist gantry crane dynamic stiffness , expanding the door crane static , dynamic stiffness range checking for gantry crane characteristics and analysis of existing research data , it is recommended that the static and dynamic stiffness control value for the realization of dynamic design gantry crane has created favorable conditions . Keywords gantry crane , the dynamic stiffness of the CLC TH2; TU390 Introduction gantry cranes (the door ) is an important Lifting Equipment Yard steel crane national economic departments , warehouses and assembly plant widely used , it can be divided into single girder trolley hoist gantry crane and standard double girder gantry crane trolley two types , with the corresponding divided into single and double girder gantry girder gantry two structural types ( Figure 1 (c), 1 (e) and 1 (d)), divided into a leg frame (Fig. 1 (c), 1 (d)) and L (Fig. 1 (e). door according to the size of the span。

2014年1月16日星期四

Design and implementation of a three-dimensional virtual gantry crane system of automatic control

21st century information engineering has achieved unprecedented development , computer technology as the core technology has been widely applied to various fields of social life . Virtual reality technology as a cutting-edge computer science technology, broadband networks , high-tech multimedia and integration of artificial intelligence , sino hoist the continuous development of technology, the construction of a virtual laboratory became possible to establish virtual experiments can greatly promote education development of information technology to improve the level of education development in China , especially for relatively scarce educational resources in the western region is more important. Currently virtual laboratory use more two-dimensional plane design approach , in terms of experimental realism, interactivity and teaching and the reality falls far short of the experimental effects , can not meet the needs of actual teaching. With greatly enhance the development of computer graphics technology and computer graphics performance ever achieved only on high-performance computer desktop virtual reality can now also running on an ordinary personal computer , virtual reality technology thus hoist gantry crane unprecedented popularity extent , also brought new vitality to the development of a virtual laboratory . This paper analyzes the drawbacks of traditional laboratory summarizes research status at home and abroad in terms of virtual experiments , the background to the process control laboratory for experimental teaching process automation professionals - tank experimental research.

2014年1月13日星期一

Common Assembly hoist crane

Bridge crane assembly is a very common means of transport, in ports, warehouses , construction sites and other places have been widely used. However at runtime overhead crane , trolley load swing caused by the games , which would reduce the efficiency of oscillating the one hand, the crane system , and on the other hand may cause the load of the operator or other steel crane objects caused by injury or collision loss. Therefore, many scholars overhead crane system controls a lot of research work : ask the car quickly and accurately reach the target position , on the other hand also requires the ability to effectively suppress the swinging of the load. The most common method of controlling open loop overhead crane shaping the input (Input Shaping), but this method requires high precision of the system parameters , and thus more hoist gantry crane to solve the closed-loop control and suppress the swing carriage positioning problems. Chang et fuzzy logic main bridge crane in a position to meet the accuracy requirements of the swing angle suppression . Fang Yong, et al pure energy -based control method , by increasing the dynamic coupling between the trolley and the load characteristics to achieve good control of the cable car system ; several advanced nonlinear control methods which are applied to the overhead crane system .

2014年1月8日星期三

Electric eot crane hoist installation methods described in detail

First, you need to install the sino hoist box ; Second , connect the power cord to connect the power cord to be cut off in advance. While the ground should be well grounded , otherwise touch any part of the operator or chain hoist , may feel a shock feeling. Third, the degree of load chain lubrication chain lubrication chain hoist load chain is an important factor affecting the service life . Timely and effective lubrication of the effective life of the load chain , in order to ensure the chain. Fourth, check the chain hoist gantry crane for multiple lines of electric chain hoist chain should ensure that aircraft are not under the hook flipped . If you flip to restore it to a normal state, to ensure that the chain of weld arranged in rows . Do not twist the chain hoist hanging loads. Finally, check the operating voltage due to electric chain hoist factory , is based on user-specified voltage or high voltage equipment ( only dual voltage terms ) , such as 230/460V, need to check the wiring and make sure the power supply voltage meets requirements. If not, please refer to the manual must be corrected in order to meet the requirements of the operating voltage .

2014年1月5日星期日

Introduction to the electric hoist gantry crane girder production technology (box)

With the continuous development of social hoist gantry crane development, the manufacturing level has been rapidly improving. Electric hoist gantry crane is an indispensable equipment in building materials market, the manufacturing quality of high and low, directly affect its performance. Especially the metal structure manufacturing quality, plays an vital role in the safe use. Now to the rated lifting a total quality of 10 t electric hoist gantry crane as a case, introduced the production technology, hoping to play a good reference for similar projects. The related technical parameters are as follows: electric hoist gantry crane: rated lifting the quality of 10 t; Design chief, 36 m; Door leg span 24 m; Hoisting height 9 m; The beam width 6 m; Single girder structure, the door legs into the "eight" glyph stress; 4 wheel bearing, two-wheel driven. Whole steel crane body into the box structure is long and narrow shape, the girder web plate thickness is thinner, weld, and mainly concentrated in the top side, large amount of welding. Which is the most difficult to control point is: the main girder camber, web verticality, lateral bending, and 24 m span. Because the making craft of main girder has certain representativeness, door for other structures such as beam under rigid legs, manufacturing has important reference, in the only for the three of the crane structure of main girder of the production process, talk about manufacturing technology and quality control.

2014年1月3日星期五

The safety of the crane operation technical requirements

Crane belongs to a large hoisting equipment, if the operation is easy to be imprudent man-made accidents, so care must be taken in the operation, the safety of the follow certain principles. Below is to explain the safety of the crane operational technical requirements:
1) check 怍 industry field. The field to flat, can not have inclination and muddy. Flexible leg, work with plate bearing (board size is 400 x 400 x 400 mm). The scope of work you have plenty of hoisting, rotary space.
2) and leg: put a leg, you must hoist gantry crane put telescopic legs after put lifting leg, the leg in a horizontal direction stretch out first, and then to leg down to the ground, until when will frame set up; For legs, you must first accept lifting leg contraction after telescopic leg. Order release can't mistake, otherwise, will produce the oil pipeline rupture or other accidents such as adjust the leg in the lifting operation, should be steel crane again after unloading, it is strictly prohibited to lifting weights adjustment after a hurricane.
3) homework before, it was with tightened hand brake, the gear lever in the neutral. Start the engine preheating operation to normal temperature.
4) for air brake of heavy machine, assignments, climb to 600 kpa pressure, turn the gas shift control valve, the oil pump operation. To adopt pump in diesel engine under no-load running rapidly after 2 min, before lifting operations.
5) before each assignment will try hanging, namely a heavy lift off the ground 50-100 - mm, inspection and the reliability of the actuator, estimated load condition, monitor the stability of the leg. Such as cushion flat leg below rough available block, block size is not less than 400 * 400 * 80 mm.
6) during the lifting operations, steel wire rope should be kept vertical, are not allowed to be inclined and horizontal hanging, lest the machine capsized.
7) when punching bag high weight, asked the hook with a pulley should keep a certain distance, in case of winding limiter failure caused by wire rope tensile or rear suspension arm. To not drop limit position limiter crane, steel wire rope on the drum is allowed to put all in work, should retain 2 ~ 3 laps, to end off the prevention and control of wire rope.
8) general crane boom in the front fan arc zone can't operation, as shown in figure 4, 23. But there is my factory production of truck crane, double H leg, additional fifth leg, namely after the first leg, expand its operating area, can achieve 360 ° full rotation

2013年12月25日星期三

The safety of the crane is used

Overview of a certain steel company mainspan no.2 steelmaking plant a hook bridge crane hoisting the steel slag, caused by secondary hook header to vice hook to hang spreader collision girder falling, applied on the surface of the hit to death a line homework personnel. At the scene of the accident to a steel mill mainspan, engaged in hoist gantry crane transportation operations lifting equipment is a hook double beam crane, crane rated lifting weight G = 30/10 t S = 19.5 m, span, lifting height H = 16 m, lifting speed.vn = 7.5 n/min, the crane cart running speed vitamin k = 87.6 m/min, the car speed vitamin k = 42.4 m/min, crane work volume for the A5. Accident process for a crane driver at the end of a set of the lifting process, vice hook back, move the hook to assignments, a vice steel crane in the ascent of the at the same time, moved the main hook of crane load, and all the attention focused on the main hook run down, and did not pay attention to pair of hook lifting operation, the secondary hook collision with girder summit, vice hook hook line's fall from 16 m altitude and hit the ground line personnel b, caused b serious accident died on the spot.

2013年12月20日星期五

Crane (car) of the wheel rim contact with the side of the track

Crane (car) of the wheel rim contact with the side of the track, friction and wear in the running process of a kind of phenomenon. Wheel steel crane and the theory of unilateral clearance on the side of the track can generally be classified as 5 ~ 15 mm, as long as crane (car) in the process of running wheels horizontal offset is greater than this value, gnaw rail occurs, it is gnaw rail boundary conditions. Gnaw rail serious when although crane can not continue to use, but flange and rail friction will increase, will affect the service life of some components, to use causes pecuniary loss to unit. For sino hoist span bridge crane, due to factors such as manufacturing, car easy to gnaw rail accidents. Based on this, this paper analyzes the reasons of large span thin sorghum gnaw rail, put forward the corresponding countermeasures and improvement methods is very necessary. Bridge crane gnaw rail car cause analysis for large size hook bridge crane, in the use of more than a year later, often find crane gnaw rail car phenomenon, and all is the car outside rim gnaw rail to readjust the car wheel after the parallelism and perpendicularity to conform to the requirements, still did not solve the problem.

2013年12月18日星期三

Multi-function crane is the main equipment in the electrolytic aluminum industry workshop electrolytic workshop

PTM itself structure and is sino hoist used in domestic industrial workshop of ordinary crown difference is bigger, end of PTM has several across the car, and asymmetric arrangement on both sides, on one side of the crane load of this kind of PTM is larger, are different from common crane, and use very frequently. As a result, the steel crane beams under the action of the PTM mechanical performance analysis, understand the crane beam under complex hoist gantry crane load stress mechanism has certain practical value. To this end, this paper conducted the following work: through ANSYS finite element software simulation analysis, extract the different span and different braking structure of multi-function crane beam under load condition and load condition 2 is one of the most disadvantageous section internal force value. Reference for ordinary steel structure design specification of steel crane beam of bridge crane design standard, for multi-function steel crane beam system strength, deflection, stability calculation, and the multi-function crane beam system to evaluate the amount of steel. Through the ANSYS eigenvalue buckling analysis, considering the different load condition, different span of space model, the multi-function steel crane beam system for elastic stability bearing capacity analysis, draw a multi-functional steel crane beam system linear elastic phase of the buckling load and buckling mode.

2013年12月16日星期一

The status of the large lifting equipment

Where in the world worse than foreign domestic hoisting equipment condition of large hoisting equipment, marks a national engineering machinery manufacturing capacity, determine the traffic construction speed and quality. Our country really started to manufacture large transport machinery lifting equipment in the 70 s, after nearly 30 years of hoist gantry crane exploration, has made great development. Large hoisting equipment level of design capability, manufacturing, lifting load and the intrinsic quality, mechanical properties and the contents of science and technology, continuously leapfrog development. At present, is moving toward product seriation, variety diversification, sino hoist operation, intelligent operation and performance of modern direction. $$in recent years, our country developed successfully developed large hoisting equipment, and identified by authority department has been close to or reached the current international advanced level. And initially formed the development of generation, research generation, reserve generation of production pattern. Based $$$$from scratch to lay looking back the development course we may see that the first 20 years since the founding of new China, our country because do not have the ability to create large lifting equipment, lead to transportation and engineering infrastructure used imports all large lifting equipment. $$in the next few years, our country successfully developed the 38 meters high, weight of 140 tons, the hoisting with 10 tons of port portal crane M10-25 type.

2013年12月12日星期四

Virtual prototype implementation of double beam bridge crane

Virtual prototype implementation of double beam bridge crane, virtual prototype technology can save on time and money for the designer, so once available, for the vast number of engineering and technical personnel has a great attraction. The virtual prototype technology in the aerospace, weapons manufacturing, engineering machinery, automobile sino hoist and other fields has been widely used in double beam bridge crane as the object of virtual design, application of solidworks 3 d modeling software to complete the bridge crane virtual prototype modeling and assembly of parts and engine. Bridge crane bridge crane can be divided into 2 d assembly model of single girder bridge crane, double girder bridge crane, gm bridge crane, etc. Bridge crane equipment; The car run institutions; Bridge structure; The cab; Block and tackle. Supporting institutions; Cart orbital plane figure bridge crane structure schematic virtual prototype design bridge crane parts hoist gantry crane modeling parts parameterized modeling, first determine the design scheme of bridge crane, then apply solidworks software components of the three-dimensional model is set up, and carries on the parametric design. In the process of parameterized modeling, designer need only a part of sketch of some numerical modeling parameters (length, Angle, etc.) was analyzed and modified.

2013年12月11日星期三

The use of deep resources

Deep shallow earth resources depleted, the utilization of resources is imperative. But now the use of these resources is very difficult, such as mineral hoisting sino hoist from now hundreds of meters to thousands of meters, the existing technology ascension is difficult or can't do it. Has been proved more than 1500 m deep mineral how to mining? With a bold the diameter of the wire rope or increasing the number of effective? Is the line, this choice is reasonable? The handkerchief to ascend, because the whole series of safety problems in a string so its safety coefficient is high, generally in 5 ~ 9. The higher the hoisting height, the bigger the material hoist gantry crane. Rope is coarse, elevator design and manufacture of the greater difficulty will be. Installation, use and change the rope work more difficult. Such as hoisting height above 1500 m, rope only a weight has been considerable. Mine production conditions, due to causes corrosion and other mechanical damage to the steel wire rope, the use fixed number of year, generally very short, every change once caused great waste of resources, and influence the mine production.

2013年12月9日星期一

Crane beam is the subgrade support girder vehicle running

Crane beam is the subgrade support girder vehicle running, used in steel structure factory building. Crane rail crane beam, truss car by driving back and forth on the crane beam orbit. Like steel crane beam, the difference between crane beam web plate welding with steel crane plate, provide support for lift girder car lifting heavy objects. Welding crane beam flange plate of the appropriate USES a layer of steel plate, when two layers of steel plate is used, the outer plate should be along the long Liang Tong Settings, and in the design and construction sino hoist should be taken to make the top flange closely contact with two layers of steel plate. Supporting clamp or rigid material rake hard hook crane and similar structure, truss and brake truss crane is unfavorable use. Crane Liang Yi flange or web of welding arc plates with stitching should be adopted and lead plate, penetration butt weld arc plate and lead plate cutting place should be polished smooth. Crane beam welding and welding construction crane truss segment splicing welding should be adopted or friction type high strength bolt connection.

2013年12月6日星期五

Simple beam bridge crane type

imple beam bridge crane type:
Hot metal ladle crane: used for lifting into the mixer, the molten steel into concast steel furnace and lifting equipment or ingot mould etc. Main car lifting bucket, deputy car to steel crane bucket and so on auxiliary work.
Clamp crane: use clamp to high temperature steel ingot vertically to the pit in soaking pit, or put it out in the ingot of the car.
Stripping crane: for the ingot from the ingot mould forced out. Car have special stripping device, stripping way according to the shape of the mold, some with pole pin ingot ingot crane, use tongs to lodge a mold; Some use tongs pressure mold, with a small pliers ingot.
Loading crane: for the charge to the open hearth furnace. Main car column bottom is equipped with ram, to stir up inside the container and send it to charging. The main column around the vertical axis rotation, ram can be bobbing up and down and turning. Vice car used to repair the furnace sino hoist as auxiliary operations.
Forging crane: to cooperate with hydraulic press forging large workpiece. Main car hanging on the hook special feeder, turned to support and artifacts; The car used to lift the artifacts.