"One machine can" in order to improve the efficiency of loading and unloading operations, streamline operations, reduce personnel manual labor, improve security operations security, but also improve the existing gantry crane is an important means of utilization. sino hoist Therefore, different varieties of packaged goods Soca tools, such as grab, timber grab, container spreader, steel hooks, coil clips, etc., hanging on the door to get the promotion and application success. Any use of Soca with, the necessary conditions to ensure personal, equipment, cargo security. But the recent detection of a gantry crane found in the station, the station a 20/10 t C-type door grab crane during operation, there is a more serious overload of work, but whether it is management, or the use of staff has neither aware of the existence of overweight. According to the survey, hoist gantry crane the railway yard gantry crane using four rope grab operation, almost all such problems exist. When equipped with grab, no matter whether the change in varieties of goods, grab generally unchanged.
Hoist crane mechanism is unique is the use of a three-drive unit, three drive means is to drive the motor, brake and transmission brake device as one of the three gear (almost without coupling) of a compact and lightweight drive.
2014年1月23日星期四
2014年1月22日星期三
Gantry crane
Is an important branch of general sino hoist machinery , as stevedores to reduce labor intensity and improve the conditions of workers to operate and improve the production capacity of loading and unloading of large lifting and handling equipment , widely used in the open-air yard , storage terminals , railway stations , construction sites and other places. With economic development , it is not only occupies an important position in the national economy , but also in the field of social production and life are also expanding. Main beam is the main force component gantry crane under load , will produce under torsion deformation, trolley tracks a certain slope, so the car climbing resistance generated by the main hoist gantry crane beams running across the middle to the ends , it may cause motor overload or gnawing different degrees rail , seriously affecting the crane to work, and even lead to accidents. Currently, the way to solve such problems in the industry are designed and manufactured the crane when the main beam geometry on a certain arch . In fact , this is also not reasonable arch curve , the same slope to overcome considerable resistance because when the car is running near the legs , and, after working for some time on the camber deformation will gradually reduce , or even disappear. This paper attempts to take advantage of changes in the height of the main beam deflection legs to compensate for deformation under the influence , combined with the finite element analysis software ANSYS simulation , and achieved the expected results.
2014年1月20日星期一
Truss gantry crane
With light weight , small frontal area , large carrying capacity and other characteristics, are widely used in factories , railway stations , ports, power plants, construction sites and other steel crane areas of production. Rationality and reliability of its security architecture design , and the ability to work directly determines the efficiency of the crane . Now most companies by virtue of experience to design truss gantry crane , the utilization of steel is low, and detailed design calculations and relatively cumbersome. Therefore, the steel truss crane design and analysis , has become the focus of design in the field of research , and the main beam is a major part of the door frame . In this paper, the use of modern design methods, lifting the total mass of 60 t, span 40 m, lifting height of 16 m, main beam structure hoist gantry crane working-level A3 truss gantry crane optimization. Main beam structure optimization mathematical model of optimization objective function optimization goals gantry crane metal structure is the total mass of the smallest structure itself , which is a parameter VOLUME minimum value . Design variables need to optimize the design variables are independent variables objective function and state function . Optimization process is optimized by constantly changing variable values to achieve. Truss girder gantry crane main components, mainly steel, link8 unit can be modeled .
2014年1月17日星期五
Vertical and horizontal gantry crane dynamic stiffness
Vertical and horizontal gantry crane dynamic stiffness Ge-Ning Xu . Tsui Hark Jin ( Department of Mechanical Engineering ) Abstract gantry cranes for different types of vibration analysis conducted research , presented a series of practical formulas gantry crane vertical and horizontal dynamic stiffness , add a calculation method static and hoist gantry crane dynamic stiffness , expanding the door crane static , dynamic stiffness range checking for gantry crane characteristics and analysis of existing research data , it is recommended that the static and dynamic stiffness control value for the realization of dynamic design gantry crane has created favorable conditions . Keywords gantry crane , the dynamic stiffness of the CLC TH2; TU390 Introduction gantry cranes (the door ) is an important Lifting Equipment Yard steel crane national economic departments , warehouses and assembly plant widely used , it can be divided into single girder trolley hoist gantry crane and standard double girder gantry crane trolley two types , with the corresponding divided into single and double girder gantry girder gantry two structural types ( Figure 1 (c), 1 (e) and 1 (d)), divided into a leg frame (Fig. 1 (c), 1 (d)) and L (Fig. 1 (e). door according to the size of the span。
2014年1月16日星期四
Design and implementation of a three-dimensional virtual gantry crane system of automatic control
21st century information engineering has achieved unprecedented development , computer technology as the core technology has been widely applied to various fields of social life . Virtual reality technology as a cutting-edge computer science technology, broadband networks , high-tech multimedia and integration of artificial intelligence , sino hoist the continuous development of technology, the construction of a virtual laboratory became possible to establish virtual experiments can greatly promote education development of information technology to improve the level of education development in China , especially for relatively scarce educational resources in the western region is more important. Currently virtual laboratory use more two-dimensional plane design approach , in terms of experimental realism, interactivity and teaching and the reality falls far short of the experimental effects , can not meet the needs of actual teaching. With greatly enhance the development of computer graphics technology and computer graphics performance ever achieved only on high-performance computer desktop virtual reality can now also running on an ordinary personal computer , virtual reality technology thus hoist gantry crane unprecedented popularity extent , also brought new vitality to the development of a virtual laboratory . This paper analyzes the drawbacks of traditional laboratory summarizes research status at home and abroad in terms of virtual experiments , the background to the process control laboratory for experimental teaching process automation professionals - tank experimental research.
2014年1月13日星期一
Common Assembly hoist crane
Bridge crane assembly is a very common means of transport, in ports, warehouses , construction sites and other places have been widely used. However at runtime overhead crane , trolley load swing caused by the games , which would reduce the efficiency of oscillating the one hand, the crane system , and on the other hand may cause the load of the operator or other steel crane objects caused by injury or collision loss. Therefore, many scholars overhead crane system controls a lot of research work : ask the car quickly and accurately reach the target position , on the other hand also requires the ability to effectively suppress the swinging of the load. The most common method of controlling open loop overhead crane shaping the input (Input Shaping), but this method requires high precision of the system parameters , and thus more hoist gantry crane to solve the closed-loop control and suppress the swing carriage positioning problems. Chang et fuzzy logic main bridge crane in a position to meet the accuracy requirements of the swing angle suppression . Fang Yong, et al pure energy -based control method , by increasing the dynamic coupling between the trolley and the load characteristics to achieve good control of the cable car system ; several advanced nonlinear control methods which are applied to the overhead crane system .
2014年1月8日星期三
Electric eot crane hoist installation methods described in detail
First, you need to install the sino hoist box ; Second , connect the power cord to connect the power cord to be cut off in advance. While the ground should be well grounded , otherwise touch any part of the operator or chain hoist , may feel a shock feeling. Third, the degree of load chain lubrication chain lubrication chain hoist load chain is an important factor affecting the service life . Timely and effective lubrication of the effective life of the load chain , in order to ensure the chain. Fourth, check the chain hoist gantry crane for multiple lines of electric chain hoist chain should ensure that aircraft are not under the hook flipped . If you flip to restore it to a normal state, to ensure that the chain of weld arranged in rows . Do not twist the chain hoist hanging loads. Finally, check the operating voltage due to electric chain hoist factory , is based on user-specified voltage or high voltage equipment ( only dual voltage terms ) , such as 230/460V, need to check the wiring and make sure the power supply voltage meets requirements. If not, please refer to the manual must be corrected in order to meet the requirements of the operating voltage .
2014年1月5日星期日
Introduction to the electric hoist gantry crane girder production technology (box)
With the continuous development of social hoist gantry crane development, the manufacturing level has been rapidly improving. Electric hoist gantry crane is an indispensable equipment in building materials market, the manufacturing quality of high and low, directly affect its performance. Especially the metal structure manufacturing quality, plays an vital role in the safe use. Now to the rated lifting a total quality of 10 t electric hoist gantry crane as a case, introduced the production technology, hoping to play a good reference for similar projects. The related technical parameters are as follows: electric hoist gantry crane: rated lifting the quality of 10 t; Design chief, 36 m; Door leg span 24 m; Hoisting height 9 m; The beam width 6 m; Single girder structure, the door legs into the "eight" glyph stress; 4 wheel bearing, two-wheel driven. Whole steel crane body into the box structure is long and narrow shape, the girder web plate thickness is thinner, weld, and mainly concentrated in the top side, large amount of welding. Which is the most difficult to control point is: the main girder camber, web verticality, lateral bending, and 24 m span. Because the making craft of main girder has certain representativeness, door for other structures such as beam under rigid legs, manufacturing has important reference, in the only for the three of the crane structure of main girder of the production process, talk about manufacturing technology and quality control.
2014年1月3日星期五
The safety of the crane operation technical requirements
Crane belongs to a large hoisting equipment, if the operation is easy to be imprudent man-made accidents, so care must be taken in the operation, the safety of the follow certain principles. Below is to explain the safety of the crane operational technical requirements:
1) check 怍 industry field. The field to flat, can not have inclination and muddy. Flexible leg, work with plate bearing (board size is 400 x 400 x 400 mm). The scope of work you have plenty of hoisting, rotary space.
2) and leg: put a leg, you must hoist gantry crane put telescopic legs after put lifting leg, the leg in a horizontal direction stretch out first, and then to leg down to the ground, until when will frame set up; For legs, you must first accept lifting leg contraction after telescopic leg. Order release can't mistake, otherwise, will produce the oil pipeline rupture or other accidents such as adjust the leg in the lifting operation, should be steel crane again after unloading, it is strictly prohibited to lifting weights adjustment after a hurricane.
3) homework before, it was with tightened hand brake, the gear lever in the neutral. Start the engine preheating operation to normal temperature.
4) for air brake of heavy machine, assignments, climb to 600 kpa pressure, turn the gas shift control valve, the oil pump operation. To adopt pump in diesel engine under no-load running rapidly after 2 min, before lifting operations.
5) before each assignment will try hanging, namely a heavy lift off the ground 50-100 - mm, inspection and the reliability of the actuator, estimated load condition, monitor the stability of the leg. Such as cushion flat leg below rough available block, block size is not less than 400 * 400 * 80 mm.
6) during the lifting operations, steel wire rope should be kept vertical, are not allowed to be inclined and horizontal hanging, lest the machine capsized.
7) when punching bag high weight, asked the hook with a pulley should keep a certain distance, in case of winding limiter failure caused by wire rope tensile or rear suspension arm. To not drop limit position limiter crane, steel wire rope on the drum is allowed to put all in work, should retain 2 ~ 3 laps, to end off the prevention and control of wire rope.
8) general crane boom in the front fan arc zone can't operation, as shown in figure 4, 23. But there is my factory production of truck crane, double H leg, additional fifth leg, namely after the first leg, expand its operating area, can achieve 360 ° full rotation
1) check 怍 industry field. The field to flat, can not have inclination and muddy. Flexible leg, work with plate bearing (board size is 400 x 400 x 400 mm). The scope of work you have plenty of hoisting, rotary space.
2) and leg: put a leg, you must hoist gantry crane put telescopic legs after put lifting leg, the leg in a horizontal direction stretch out first, and then to leg down to the ground, until when will frame set up; For legs, you must first accept lifting leg contraction after telescopic leg. Order release can't mistake, otherwise, will produce the oil pipeline rupture or other accidents such as adjust the leg in the lifting operation, should be steel crane again after unloading, it is strictly prohibited to lifting weights adjustment after a hurricane.
3) homework before, it was with tightened hand brake, the gear lever in the neutral. Start the engine preheating operation to normal temperature.
4) for air brake of heavy machine, assignments, climb to 600 kpa pressure, turn the gas shift control valve, the oil pump operation. To adopt pump in diesel engine under no-load running rapidly after 2 min, before lifting operations.
5) before each assignment will try hanging, namely a heavy lift off the ground 50-100 - mm, inspection and the reliability of the actuator, estimated load condition, monitor the stability of the leg. Such as cushion flat leg below rough available block, block size is not less than 400 * 400 * 80 mm.
6) during the lifting operations, steel wire rope should be kept vertical, are not allowed to be inclined and horizontal hanging, lest the machine capsized.
7) when punching bag high weight, asked the hook with a pulley should keep a certain distance, in case of winding limiter failure caused by wire rope tensile or rear suspension arm. To not drop limit position limiter crane, steel wire rope on the drum is allowed to put all in work, should retain 2 ~ 3 laps, to end off the prevention and control of wire rope.
8) general crane boom in the front fan arc zone can't operation, as shown in figure 4, 23. But there is my factory production of truck crane, double H leg, additional fifth leg, namely after the first leg, expand its operating area, can achieve 360 ° full rotation
2013年12月25日星期三
The safety of the crane is used
Overview of a certain steel company mainspan no.2 steelmaking plant a hook bridge crane hoisting the steel slag, caused by secondary hook header to vice hook to hang spreader collision girder falling, applied on the surface of the hit to death a line homework personnel. At the scene of the accident to a steel mill mainspan, engaged in hoist gantry crane transportation operations lifting equipment is a hook double beam crane, crane rated lifting weight G = 30/10 t S = 19.5 m, span, lifting height H = 16 m, lifting speed.vn = 7.5 n/min, the crane cart running speed vitamin k = 87.6 m/min, the car speed vitamin k = 42.4 m/min, crane work volume for the A5. Accident process for a crane driver at the end of a set of the lifting process, vice hook back, move the hook to assignments, a vice steel crane in the ascent of the at the same time, moved the main hook of crane load, and all the attention focused on the main hook run down, and did not pay attention to pair of hook lifting operation, the secondary hook collision with girder summit, vice hook hook line's fall from 16 m altitude and hit the ground line personnel b, caused b serious accident died on the spot.
2013年12月18日星期三
Multi-function crane is the main equipment in the electrolytic aluminum industry workshop electrolytic workshop
PTM itself structure and is sino hoist used in domestic industrial workshop
of ordinary crown difference is bigger, end of PTM has several across
the car, and asymmetric arrangement on both sides, on one side of the
crane load of this kind of PTM is larger, are different from common
crane, and use very frequently. As a result, the steel crane beams under
the action of the PTM mechanical performance analysis, understand the
crane beam under complex hoist gantry crane load stress mechanism has certain
practical value. To this end, this paper conducted the following work:
through ANSYS finite element software simulation analysis, extract the
different span and different braking structure of multi-function crane
beam under load condition and load condition 2 is one of the most
disadvantageous section internal force value. Reference for ordinary
steel structure design specification of steel crane beam of bridge crane
design standard, for multi-function steel crane beam system strength,
deflection, stability calculation, and the multi-function crane beam
system to evaluate the amount of steel. Through the ANSYS eigenvalue
buckling analysis, considering the different load condition, different
span of space model, the multi-function steel crane beam system for
elastic stability bearing capacity analysis, draw a multi-functional
steel crane beam system linear elastic phase of the buckling load and
buckling mode.
2013年12月16日星期一
The status of the large lifting equipment
Where in the world worse than foreign domestic hoisting equipment
condition of large hoisting equipment, marks a national engineering
machinery manufacturing capacity, determine the traffic construction
speed and quality. Our country really started to manufacture large
transport machinery lifting equipment in the 70 s, after nearly 30 years
of hoist gantry crane exploration, has made great development. Large hoisting
equipment level of design capability, manufacturing, lifting load and
the intrinsic quality, mechanical properties and the contents of science
and technology, continuously leapfrog development. At present, is
moving toward product seriation, variety diversification, sino hoist
operation, intelligent operation and performance of modern direction.
$$in recent years, our country developed successfully developed large
hoisting equipment, and identified by authority department has been
close to or reached the current international advanced level. And
initially formed the development of generation, research generation,
reserve generation of production pattern. Based $$$$from scratch to lay
looking back the development course we may see that the first 20 years
since the founding of new China, our country because do not have the
ability to create large lifting equipment, lead to transportation and
engineering infrastructure used imports all large lifting equipment.
$$in the next few years, our country successfully developed the 38
meters high, weight of 140 tons, the hoisting with 10 tons of port
portal crane M10-25 type.
2013年12月12日星期四
Virtual prototype implementation of double beam bridge crane
Virtual prototype implementation of double beam bridge crane, virtual prototype technology can save on time and money for the designer, so once available, for the vast number of engineering and technical personnel has a great attraction. The virtual prototype technology in the aerospace, weapons manufacturing, engineering machinery, automobile sino hoist and other fields has been widely used in double beam bridge crane as the object of virtual design, application of solidworks 3 d modeling software to complete the bridge crane virtual prototype modeling and assembly of parts and engine. Bridge crane bridge crane can be divided into 2 d assembly model of single girder bridge crane, double girder bridge crane, gm bridge crane, etc. Bridge crane equipment; The car run institutions; Bridge structure; The cab; Block and tackle. Supporting institutions; Cart orbital plane figure bridge crane structure schematic virtual prototype design bridge crane parts hoist gantry crane modeling parts parameterized modeling, first determine the design scheme of bridge crane, then apply solidworks software components of the three-dimensional model is set up, and carries on the parametric design. In the process of parameterized modeling, designer need only a part of sketch of some numerical modeling parameters (length, Angle, etc.) was analyzed and modified.
2013年12月4日星期三
Bridge type crane can be over rectangular court and its operation
Bridge type crane can be above the rectangle area and its operation, more used in the place such as workshop, warehouse, open storage of goods loading and unloading, a beam crane, bridge crane, gantry crane, cable sino hoist, vehicle bridge, etc. (1) beam crane: mainly including single girder bridge crane girder crane and double beam bridge crane cranes single-beam bridge crane bridge girder with h type steel or steel section and steel plate combination. Lifting trolley is often chain hoist, electric hoist, or used as lifting mechanism parts assembled. According to the bridge bearing type and suspension type two kinds. The former bridge along the car on the beam of crane orbit; The bridge along the hanging in the workshop crane orbit under the roof. Single girder bridge crane, electric two break up. Manual single-beam bridge crane institutions working speed is low, the weight is small, but its quality is small, easy to organize production, the cost is low, when used for the power supply after carrying hoist gantry crane is not big, requirements for speed and productivity is not high. Manual single-beam bridge crane using manual monorail trolley as a running car, with the hand chain hoist as lifting mechanism, the bridge is made up of main girder and end beam. Main girder with single beams, beam with steel or bending molding steel plate welded.
2013年12月1日星期日
Bridge crane can be divided into general bridge crane, simple beam bridge crane and metallurgical special bridge crane 3 kinds
Bridge crane is widely used in indoor and outdoor warehouses, factories, docks and outdoor storage yard, etc. Bridge crane can be divided into general bridge crane, simple beam bridge crane and metallurgical special bridge crane 3 kinds. General bridge According to the frame structure bysino hoistthe car, general bridge operation, the structure of the bridge metal composition. Lifting trolley and running institutions by the lifting mechanism, the car and the car frame of three parts. Lifting mechanism including motor, brake, reducer, drum and pulley. Motor through the gear reducer, drive the drum rotation, make wound reel or wire rope from the reel down, to lift heavy things. The car frame is bracket and install the lifting mechanism and car running parts, such as organization frame, usually for welding structure. Gantry crane is generally based on the door frame structure form, the form of main girder, sling for classification. hoist gantry crane used in port.
(a) the whole gantry crane: no overhanging girder, the car in the main span.
(b) a gantry crane: leg height difference, can be used according to the field of civil engineering request.
(c) double cantilever gantry crane: one of the most common structure form, the structure of the force and the area of effective utilization is reasonable.
(d) of single cantilever gantry crane: this kind of structure is often chosen by site restrictions.
According to the main girder structure
(a) single girder gantry crane
The characteristics of the arm crane and bridge crane are basically the same. Can work, over the round ground and widely used at open handling and installation work, such as a door crane, floating crane, mast cranes, crane and deck crane, etc.
Arm crane include lifting mechanism, luffing mechanism, rotating mechanism. Rely on these institutions cooperate with action, can make the weight lifting and handling within a cylindrical space. Arm crane installed on vehicles, or other forms of transport (mobile) tools, thus constitute the arm posture slewing crane operation. Such as auto crane, wheel crane, tower crane, portal crane, floating crane, rail crane, etc.
2013年11月28日星期四
The steel crane beam
One part of the steel crane beam system design. The steel crane beam is
for bridge crane steel components. Crane beam type load on the crane
beam and action are: crane vertical load, horizontal and vertical
horizontal load, crane repair platform of live load, the part weight of
crane beam system, supporting the roof structure of the crane beam
system load and wall frame structure. Based on the hoist gantry crane of the steel
crane beam damage reason in service, this paper discusses the current
steel crane beam design and the difference of the actual stress and its
harm, put forward the problems existing in the current in the design of
the steel crane beam, and studied and analyzed the existing problems and
the breakage of the beam in the design of beam and results in the
decrease of its reliability.
2013年9月6日星期五
Concrete machinery industry consolidation to accelerate
China Construction Machinery Industry Association Concrete
bridge gantry crane Branch of the past 10 years statistics show that China's holdings of concrete machinery mainly include: 50m3 / h above the mixing station (F) 33931, 44993 concrete pump station, pump 39,889 units, mixer truck 228,822 units; 350L concrete mixer over 200,721 units, reached a total of 548,356 units. The actual construction of the statistics show that a lot of mixing stations produce less than 50% of design capacity.
Although the rate of production is not high, but the industry development prospects of low-threshold access and still continues to attract investors to enter, while the concrete hoist gantry crane industry upstream customers, their bargaining power is gradually strengthened.
Concrete manufacturing companies, construction units, and leasing concrete machinery industry accounted for about 80% of the purchasing market share. With conch, landscapes, Jidong, Yatai, Huaxin, China Resources Cement and other large enterprises have entered the concrete market, the company's strong organizational performance and cost advantages will bring new competition; On the other hand, local industries and enterprises concentration is increasing, such as Shanghai construction Group, and its subsidiary companies accounted for the total production of concrete concrete in Shanghai 30% of total market share, which will further enhance the bargaining power of buyers, the size of concrete machinery products, quality and service will also put forward higher requirements.
Throughout 2013, we expect concrete steel crane industry consolidation will further exacerbate the product will also provide lightweight, large-scale, high-end, integrated direction. But this also brings another problem --- new machine sales space will be further squeezed upgrading products. Those that produce small, but the high cost of SME, you need to leading enterprises under the law of diminishing marginal utility, to seek a breakthrough in market segments.
Although the rate of production is not high, but the industry development prospects of low-threshold access and still continues to attract investors to enter, while the concrete hoist gantry crane industry upstream customers, their bargaining power is gradually strengthened.
Concrete manufacturing companies, construction units, and leasing concrete machinery industry accounted for about 80% of the purchasing market share. With conch, landscapes, Jidong, Yatai, Huaxin, China Resources Cement and other large enterprises have entered the concrete market, the company's strong organizational performance and cost advantages will bring new competition; On the other hand, local industries and enterprises concentration is increasing, such as Shanghai construction Group, and its subsidiary companies accounted for the total production of concrete concrete in Shanghai 30% of total market share, which will further enhance the bargaining power of buyers, the size of concrete machinery products, quality and service will also put forward higher requirements.
Throughout 2013, we expect concrete steel crane industry consolidation will further exacerbate the product will also provide lightweight, large-scale, high-end, integrated direction. But this also brings another problem --- new machine sales space will be further squeezed upgrading products. Those that produce small, but the high cost of SME, you need to leading enterprises under the law of diminishing marginal utility, to seek a breakthrough in market segments.
Increase the concrete machinery industry consolidation in 2013 and strive to grow over 10%
First half of 2012 compared to the overall decline in construction machinery more than 20% , concrete hoist gantry crane industry, a positive growth of 15% has been considered substantial. But by the general trend of the tired , the domestic turnover of enterprises fell concrete , individual enterprises and even fell by 40% ( this data from China Construction Machinery Industry Association Concrete Machinery Branch ) , but to become an indisputable fact . The relatively high margin segments plate, can continue to outshine in 2013 ? Acquired the world's three giant Chinese concrete machinery enterprises can successfully digest, to accelerate growth ? Urbanization bonus , concrete machinery industry is able to enjoy much ?
Severe overcapacity
2013 , China 's construction machinery industry is still the most serious problem to the inventory . 2012 1 ~ 10 months of construction overhead gantry crane industry production run Express showed that in October , the national construction machinery industry total industrial output value 42,263,000,000 yuan , an increase of -9.19 % , growth of -4.14 % ; sales value of 41.973 billion yuan , up growth was -7.74 % -8.03 % MoM growth . And 1 to 10 months, the national construction machinery industry 501.633 billion yuan industrial output value , up slightly by 1.53 percent ; completion of the sale value of 492.263 billion yuan , up by only 2.5%. Thus, despite the industry in the chants of " excess capacity to be alert ," but the production expansion and shrinking sales of paradox has not been fundamentally improved.
The reason is nothing more than government " steady growth" development goals, to local authorities, enterprises and even individuals have brought "Once the adjustment is completed , the economy will take off again ," is expected, therefore I went in to the inventory and production capacity is not enough, there is luck, and even continue to increase inventory.
But we should also see that the central decision-making practice has been recognized in the past as an investment and export-led economic growth, the crux and drawbacks, is unlikely to re-launch massive economic stimulus. Meanwhile, with the concrete machinery industry is closely related to the cement , steel and other industries are all high resource consumption, high energy consumption, high pollution industry, sustainable development is restricted . Therefore , accustomed to big money , earn fast money , earn easy money, concrete overhead bridge crane industry , very difficult to face like the " golden years " as a high-speed development opportunities.
Investment institutions often said that " counter-cyclical investment enterprise 's dream, is pro-cyclical investment behavior of enterprises ." Most successful businesses , more inclined to the flow of the dull business , after all, is just one example contrarian growth . Therefore, in 2013 , still faced concrete machinery to production of and deleveraging pressures , but by the downstream impact of infrastructure projects, economic recovery is expected to concrete machinery is expected to achieve more than 10% annual growth , which is still in the construction machinery sector boom over high segments .
2013 Construction Machinery difficult transition ahead to where?
Chinese economy continues to decline, the construction steel crane market worse. First half of the construction machinery industry in the voices of doubt in the market difficulties ahead. Infrastructure projects, real estate projects 3 years experience pick up weak, sluggish construction machinery enterprises in the development of enterprises in the reflection direction. No sunset industry only sunset business, how to stand out from the weak market. Construction machinery enterprises in transition to where?
Chase "niche market" clinging to the main industry
German SMEs are called "pearls scattered all over Germany," their way of life may bring us some enlightenment. German professor Hermann Simon 1996 publication of "hidden champions: from around 500 outstanding enterprises unknown revelation," a book that will attract world attention to the obscurity of these German companies: their scattered throughout Germany and numerous , small, mostly family-owned businesses, low-key acting in their respective market segments are veritable leader. These "hidden champions" The reason why people have long been neglected, an important reason is that their products there are only a part of the terminal consumer products,hoist gantry crane such as car sunroof parts; others are very easy to overlook small, such as buttons or drink label on the bottle. Frankfurt University of Finance and Economics Management Bowflex experts pointed out that Germany is a significant feature of SMEs in its products often for the "niche market", it is difficult to know by the public. However, once the German companies with strong manufacturing technology in the market segments to establish quality advantage, they will continue to increase investment in research through innovation to consolidate and expand the lead. For the German family-owned enterprises, the presence of family members, the company's management for the company's business objectives with long-term considerations, not because of short-term performance pressure to give up long-term goals. German companies generally have dedication.bridge gantry crane Once you enter a trade, they will single-minded focus on this will not be because other sectors "money scene" better and make a fresh start, or a variety of business. This undoubtedly is their success.
Construction machinery in the next 20 years of development of the "road map"
First CTO Summit in 2013, vice chairman of China Construction
hoist gantry crane Association branch chairman-cum-excavator Feng Peien "Chinese mechanical engineering technology development status, issues and trends - technology roadmap" as the theme to make presentations, report that :
Engineering the next 20 years to further develop the key issues. Commences listed is nine points, two design, seven manufacturing, in which a design was later removed, leaving seven manufacturing, so mechanical engineering technology: the first is the idea of complex electromechanical systems, modeling, optimization techniques, where the key is the modeling, modeling is the key to revision atomic structure, to conduct in-depth modeling, and not merely geometric kinematics, section II to VIII, precision molding technology, large-scale structure molding, molding technology accounted for two chapters,sino hoist and why it so pay attention to it, we found that the traditional processing are based on cutting, with the subtraction processing more than using molding methods, and now we promote the use of additive processing, greatly reducing material processing of waste and loss of energy. This is a sign of the development of the green, followed by introduction of high-speed precision machining technology, micro-nano devices and systems, intelligent manufacturing equipment, intelligent integrated drive technology, digital design, most of these are related with our intelligent. Therefore the green and intelligent direction of development in the field of eight engineering engineering technology has been fully reflected in our overhead bridge crane industry trends in extreme mentioned, the so-called extreme, that is, minimax, and extremely sophisticated, extremely high energy, this trend also in the technical field of eight projects have been fully reflected. Eight engineers determined that the next two decades our country has close relations project. These are the reasons for his important.
Engineering the next 20 years to further develop the key issues. Commences listed is nine points, two design, seven manufacturing, in which a design was later removed, leaving seven manufacturing, so mechanical engineering technology: the first is the idea of complex electromechanical systems, modeling, optimization techniques, where the key is the modeling, modeling is the key to revision atomic structure, to conduct in-depth modeling, and not merely geometric kinematics, section II to VIII, precision molding technology, large-scale structure molding, molding technology accounted for two chapters,sino hoist and why it so pay attention to it, we found that the traditional processing are based on cutting, with the subtraction processing more than using molding methods, and now we promote the use of additive processing, greatly reducing material processing of waste and loss of energy. This is a sign of the development of the green, followed by introduction of high-speed precision machining technology, micro-nano devices and systems, intelligent manufacturing equipment, intelligent integrated drive technology, digital design, most of these are related with our intelligent. Therefore the green and intelligent direction of development in the field of eight engineering engineering technology has been fully reflected in our overhead bridge crane industry trends in extreme mentioned, the so-called extreme, that is, minimax, and extremely sophisticated, extremely high energy, this trend also in the technical field of eight projects have been fully reflected. Eight engineers determined that the next two decades our country has close relations project. These are the reasons for his important.
订阅:
博文 (Atom)