2014年1月5日星期日

Introduction to the electric hoist gantry crane girder production technology (box)

With the continuous development of social hoist gantry crane development, the manufacturing level has been rapidly improving. Electric hoist gantry crane is an indispensable equipment in building materials market, the manufacturing quality of high and low, directly affect its performance. Especially the metal structure manufacturing quality, plays an vital role in the safe use. Now to the rated lifting a total quality of 10 t electric hoist gantry crane as a case, introduced the production technology, hoping to play a good reference for similar projects. The related technical parameters are as follows: electric hoist gantry crane: rated lifting the quality of 10 t; Design chief, 36 m; Door leg span 24 m; Hoisting height 9 m; The beam width 6 m; Single girder structure, the door legs into the "eight" glyph stress; 4 wheel bearing, two-wheel driven. Whole steel crane body into the box structure is long and narrow shape, the girder web plate thickness is thinner, weld, and mainly concentrated in the top side, large amount of welding. Which is the most difficult to control point is: the main girder camber, web verticality, lateral bending, and 24 m span. Because the making craft of main girder has certain representativeness, door for other structures such as beam under rigid legs, manufacturing has important reference, in the only for the three of the crane structure of main girder of the production process, talk about manufacturing technology and quality control.

2014年1月3日星期五

The safety of the crane operation technical requirements

Crane belongs to a large hoisting equipment, if the operation is easy to be imprudent man-made accidents, so care must be taken in the operation, the safety of the follow certain principles. Below is to explain the safety of the crane operational technical requirements:
1) check 怍 industry field. The field to flat, can not have inclination and muddy. Flexible leg, work with plate bearing (board size is 400 x 400 x 400 mm). The scope of work you have plenty of hoisting, rotary space.
2) and leg: put a leg, you must hoist gantry crane put telescopic legs after put lifting leg, the leg in a horizontal direction stretch out first, and then to leg down to the ground, until when will frame set up; For legs, you must first accept lifting leg contraction after telescopic leg. Order release can't mistake, otherwise, will produce the oil pipeline rupture or other accidents such as adjust the leg in the lifting operation, should be steel crane again after unloading, it is strictly prohibited to lifting weights adjustment after a hurricane.
3) homework before, it was with tightened hand brake, the gear lever in the neutral. Start the engine preheating operation to normal temperature.
4) for air brake of heavy machine, assignments, climb to 600 kpa pressure, turn the gas shift control valve, the oil pump operation. To adopt pump in diesel engine under no-load running rapidly after 2 min, before lifting operations.
5) before each assignment will try hanging, namely a heavy lift off the ground 50-100 - mm, inspection and the reliability of the actuator, estimated load condition, monitor the stability of the leg. Such as cushion flat leg below rough available block, block size is not less than 400 * 400 * 80 mm.
6) during the lifting operations, steel wire rope should be kept vertical, are not allowed to be inclined and horizontal hanging, lest the machine capsized.
7) when punching bag high weight, asked the hook with a pulley should keep a certain distance, in case of winding limiter failure caused by wire rope tensile or rear suspension arm. To not drop limit position limiter crane, steel wire rope on the drum is allowed to put all in work, should retain 2 ~ 3 laps, to end off the prevention and control of wire rope.
8) general crane boom in the front fan arc zone can't operation, as shown in figure 4, 23. But there is my factory production of truck crane, double H leg, additional fifth leg, namely after the first leg, expand its operating area, can achieve 360 ° full rotation

2013年12月25日星期三

The safety of the crane is used

Overview of a certain steel company mainspan no.2 steelmaking plant a hook bridge crane hoisting the steel slag, caused by secondary hook header to vice hook to hang spreader collision girder falling, applied on the surface of the hit to death a line homework personnel. At the scene of the accident to a steel mill mainspan, engaged in hoist gantry crane transportation operations lifting equipment is a hook double beam crane, crane rated lifting weight G = 30/10 t S = 19.5 m, span, lifting height H = 16 m, lifting speed.vn = 7.5 n/min, the crane cart running speed vitamin k = 87.6 m/min, the car speed vitamin k = 42.4 m/min, crane work volume for the A5. Accident process for a crane driver at the end of a set of the lifting process, vice hook back, move the hook to assignments, a vice steel crane in the ascent of the at the same time, moved the main hook of crane load, and all the attention focused on the main hook run down, and did not pay attention to pair of hook lifting operation, the secondary hook collision with girder summit, vice hook hook line's fall from 16 m altitude and hit the ground line personnel b, caused b serious accident died on the spot.

2013年12月20日星期五

Crane (car) of the wheel rim contact with the side of the track

Crane (car) of the wheel rim contact with the side of the track, friction and wear in the running process of a kind of phenomenon. Wheel steel crane and the theory of unilateral clearance on the side of the track can generally be classified as 5 ~ 15 mm, as long as crane (car) in the process of running wheels horizontal offset is greater than this value, gnaw rail occurs, it is gnaw rail boundary conditions. Gnaw rail serious when although crane can not continue to use, but flange and rail friction will increase, will affect the service life of some components, to use causes pecuniary loss to unit. For sino hoist span bridge crane, due to factors such as manufacturing, car easy to gnaw rail accidents. Based on this, this paper analyzes the reasons of large span thin sorghum gnaw rail, put forward the corresponding countermeasures and improvement methods is very necessary. Bridge crane gnaw rail car cause analysis for large size hook bridge crane, in the use of more than a year later, often find crane gnaw rail car phenomenon, and all is the car outside rim gnaw rail to readjust the car wheel after the parallelism and perpendicularity to conform to the requirements, still did not solve the problem.

2013年12月18日星期三

Multi-function crane is the main equipment in the electrolytic aluminum industry workshop electrolytic workshop

PTM itself structure and is sino hoist used in domestic industrial workshop of ordinary crown difference is bigger, end of PTM has several across the car, and asymmetric arrangement on both sides, on one side of the crane load of this kind of PTM is larger, are different from common crane, and use very frequently. As a result, the steel crane beams under the action of the PTM mechanical performance analysis, understand the crane beam under complex hoist gantry crane load stress mechanism has certain practical value. To this end, this paper conducted the following work: through ANSYS finite element software simulation analysis, extract the different span and different braking structure of multi-function crane beam under load condition and load condition 2 is one of the most disadvantageous section internal force value. Reference for ordinary steel structure design specification of steel crane beam of bridge crane design standard, for multi-function steel crane beam system strength, deflection, stability calculation, and the multi-function crane beam system to evaluate the amount of steel. Through the ANSYS eigenvalue buckling analysis, considering the different load condition, different span of space model, the multi-function steel crane beam system for elastic stability bearing capacity analysis, draw a multi-functional steel crane beam system linear elastic phase of the buckling load and buckling mode.

2013年12月16日星期一

The status of the large lifting equipment

Where in the world worse than foreign domestic hoisting equipment condition of large hoisting equipment, marks a national engineering machinery manufacturing capacity, determine the traffic construction speed and quality. Our country really started to manufacture large transport machinery lifting equipment in the 70 s, after nearly 30 years of hoist gantry crane exploration, has made great development. Large hoisting equipment level of design capability, manufacturing, lifting load and the intrinsic quality, mechanical properties and the contents of science and technology, continuously leapfrog development. At present, is moving toward product seriation, variety diversification, sino hoist operation, intelligent operation and performance of modern direction. $$in recent years, our country developed successfully developed large hoisting equipment, and identified by authority department has been close to or reached the current international advanced level. And initially formed the development of generation, research generation, reserve generation of production pattern. Based $$$$from scratch to lay looking back the development course we may see that the first 20 years since the founding of new China, our country because do not have the ability to create large lifting equipment, lead to transportation and engineering infrastructure used imports all large lifting equipment. $$in the next few years, our country successfully developed the 38 meters high, weight of 140 tons, the hoisting with 10 tons of port portal crane M10-25 type.

2013年12月12日星期四

Virtual prototype implementation of double beam bridge crane

Virtual prototype implementation of double beam bridge crane, virtual prototype technology can save on time and money for the designer, so once available, for the vast number of engineering and technical personnel has a great attraction. The virtual prototype technology in the aerospace, weapons manufacturing, engineering machinery, automobile sino hoist and other fields has been widely used in double beam bridge crane as the object of virtual design, application of solidworks 3 d modeling software to complete the bridge crane virtual prototype modeling and assembly of parts and engine. Bridge crane bridge crane can be divided into 2 d assembly model of single girder bridge crane, double girder bridge crane, gm bridge crane, etc. Bridge crane equipment; The car run institutions; Bridge structure; The cab; Block and tackle. Supporting institutions; Cart orbital plane figure bridge crane structure schematic virtual prototype design bridge crane parts hoist gantry crane modeling parts parameterized modeling, first determine the design scheme of bridge crane, then apply solidworks software components of the three-dimensional model is set up, and carries on the parametric design. In the process of parameterized modeling, designer need only a part of sketch of some numerical modeling parameters (length, Angle, etc.) was analyzed and modified.