1, gantry cranes are often massive structure, institutional complex mechanical equipment, rarely fully assembled from the factory shipped to the user, usually must be used in most of the scene to disperse several assembled into a complete whole. Therefore, it is necessary to reflect the correct installation crane overall eligibility to test the integrity of the whole crane and integrity.
    2, the  hoist gantry crane  is in the consumer's premises or building orbit, even in the wall of the building overhead track or a designated track or set installed on the ground, so for its orbit or mounting base, and the crane itself, is able to complement each other well, and the ability to run whether they can adapt to meet strict requirements, must go through the proper installation and post-installation commissioning and testing conclusions.
    3,  overhead gantry crane  is a kind of security work demanding a certain danger of special mechanical equipment. All safety devices and safety measures, and only after the installation of the crane to enter the normal operating position and working condition. To test these safety devices and safety equipment is reliable, flexible, accurate, and also must pass the crane installation and post-installation test to test.
   4, the crane is a special job bear lifting machinery, in order to make the gantry crane into use rights can meet various load operational requirements, it must be no load on the crane, load, overload static and dynamic load tests. These tests must be the operating state of the lifting mechanism or specific location of a stationary state and the conducted. It also requires to be carried out after installation of the crane load test only after the transfer of use.
   5,  bridge gantry crane  wire rope and other linear parts and many other parts will occur in some of the initial elongation under load, deformation, loose and so on. These must require the crane installation, commissioning loaded after correction for repair, adjustment, handling and reliable fastening, it must also be possible in the future safe and normal use of the crane.