After several years of learning and innovation, China's enterprises are gradually rewriting
steel crane foreign clients on China Construction Machinery understanding. But it is undeniable that, in the technical research, product development, innovation, reliability research, manufacturing processes, business management and other aspects of well-known international company still lags behind. This leads to our crane industry big but not strong, low profits. And in the international high-end market, especially in the large tonnage of products, the competitiveness of a serious shortage of cranes.
Single girder
overhead gantry crane , trolley runs on a single main beam, through horizontal or vertical anti-wheel anti-hook security to ensure the safety and reliability of its operation, the length of the crane lifting material particularly suitable for turning operations, major used in machinery manufacturing plant, warehouse, yard, station maintenance, assembly and other places.
Single girder gantry crane cab has two forms of manipulation and ground handling.
Single girder
bridge gantry crane features:
1, single girder gantry crane 5 tons, 10 tons, 16/3.2 tons, 20/5 t and 32/5 t 5 kinds of standards from the weight; 18 m, 22 m, 26 m, 30 m and 35 m 5 kinds of standard span.
2, this series has slip line crane cable power supply and power supply are two basic ways.
3, from the weight of 32/5 t when using trolley carts run structure (a total of eight big wheels)
4, single girder gantry crane weight less than or equal to 20/5 tons, the car take the form of a vertical counter-rollers; starting weight of 32/5 t, the level of anti-wheel trolley taken;
5, from the weight of 32/5 t, the electronic control device installed in an electrical room focused. Electrical room in the center with the leg opposite the cab.
6, single girder
hoist gantry crane rail crane lifting height is divided into two parts, both above and below the surface, the user must be careful.
没有评论:
发表评论